Mission-Critical Fuel Room Rehabilitation Tier III (2N) Data Center – Central Ontario

Contact Us About Your Facility

4,200ft² | 13-Day Completion | Zero Downtime

The Challenge

Failing Substrate

 Hydrostatic pressure caused water ingress

  • Coating failure compromised containment
  • Resulting in a diesel exposure risk
  • Located in a 2N redundancy environment


What Replacement Would Have Required

  •  Temporary fuel supply systems
  • Decommissioning tanks
  • Demolition and repour
  • Extended cure period
  • 2–4+ month exposure window

Engineered Solution

Multi-Stage Containment System

  • Mechanical surface preparation
  • Application of Resimac 503 Penetrating Primer
  • Application of Blue Resimac 501 CSRG Chemical/Corrosion Coating
  • Application of Grey Resimac 501 CSRG Chemical/Corrosion Coating

Each stage was intentionally color-coded to allow facility staff to visually confirm installation progress and quality control at all times. 

Results | 10-Year Material Warranty

Before Image (Failing Substrate)

    We do not replace infrastructure. We preserve it.

    Request a Facility Assessment Today


    Copyright © 2026 CDMR Enterprises Inc. - All Rights Reserved.


    Powered by

    This website uses cookies.

    We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

    Accept